Project log · Phase 5 of 9 complete

We stopped waiting for someone else to build it.

Rebuilding Haiti, One Layer of Brick at a Time is a family-led construction project on land we bought and paid for. The perimeter wall is standing. The steel gate is hung. The foundation is poured. Two septic tanks go ten feet into the ground. Every course of block was laid by Haitian hands, for Haitian wages.

Phases done
5
Trades hired
5
Septic depth
10 ft
Built on site
100%
Walk the site with Jocely Emile

Why we are building

You should not feel like a tourist in your own land.

Many of us left Haiti carrying an address we can no longer go back to. Family land sits empty or unsafe. When we visit, we sleep in rented rooms in our own country and leave again after a week. That is the feeling this project exists to end.

So we started with the least glamorous, most necessary work: buy the land outright, wall it, gate it, and put a real foundation under it. Not a plan on paper. Block, steel, and concrete you can stand on.

The house is the visible part. The rest is the point. Every phase is contracted to people who live nearby, and every bag of cement is bought from suppliers in the area. A build that hires locally leaves something behind after the last truck pulls out.

“A wall keeps a family safe. A payroll keeps a town alive. We are trying to do both with the same pile of block.”

Jocely Emile, campaign organizer

Build progress

The wall, course by course

Filled courses are finished and paid for. Outlined courses are what your donation goes to next.

Loading progress…

Ground level ↑ · read from the bottom up

Where the money lands

Five trades, paid on site, in Haiti.

Construction money moves through a community faster than almost anything else. A day of block work becomes a day of school fees, a market run, a fuel tank. These are the people the build pays.

  • Trade 01

    Masons

    Mixing, laying, and pointing every block in the perimeter wall and the structure above the foundation.

  • Trade 02

    Steelworkers

    Cutting and tying rebar for the foundation, and fabricating the entrance gate by hand rather than importing one.

  • Trade 03

    Plumbers

    Setting the drainage runs into the two ten-foot septic tanks and roughing in the water lines for the house.

  • Trade 04

    Truck drivers

    Hauling sand, gravel, block, and water to a site that no delivery service reaches on its own.

  • Trade 05

    Local suppliers

    Cement, block, and hardware bought from nearby shops instead of shipped in, so the margin stays in the community.

  • The multiplier

    Wages, not handouts

    No wage leaves the country. Fund a phase and you fund a payroll.

    Fund the next phase

From the site

Progress log

Three ways in

Money, materials, or a partnership.

Option one

Give money

The fastest way to keep crews working. Donations go through GoFundMe, which handles payment security and shows every contribution publicly.

  • $25 — a bag of cement
  • $150 — a mason's week
  • $500 — a truckload of block
Donate on GoFundMe

Option two

Pledge materials

Cement, rebar, block, roofing sheets, tools, a generator, a water tank, or the use of a truck. Tell us what you have and where it is, and we will tell you whether we can use it and how to get it there.

Option three

Partner with us

For companies, congregations, NGOs, and diaspora associations. Sponsor a named phase, match donations from your staff, or bring engineering and logistics support to the site.

Progress updates

Get an email when a phase finishes

Photos and a short note from the site. A few times a year, never more than once a month.

Amplify

Share the campaign

Sharing costs nothing and reliably brings in more than a single donation does.

Material pledge

What can you send?

Nothing is committed by filling this in. We will reply about condition, timing, and shipping before anything moves.

Partnership inquiry

Let's talk about scale

For organizations that want to sponsor a phase, match employee giving, or contribute expertise.